1 INTRODUCTION
2 PROJECT BACKGROUND
2.1 Ichthys Project
2.2 Ichthys FPSO
2.2.1 General description
2.2.2 Heating and cooling requirements
2.3 Annex Installations
2.3.1 Subsea
2.3.2 CPF
2.3.3 Gas Export Pipeline
2.3.4 LNG Plant
3 THE COMPANIES
3.1 Client
3.2 Constructor
3.3 Main equipment vendors
3.4 Sub-contractor for the Commissioning
3.5 Certification Company
4 THE INSTALLATION
4.1 Base of design
4.2 Description of the System
4.2.1 Cooling Medium System
4.2.2 Heating medium system
5 METHODOLOGY OF THE COMMISSIONING
5.1 Methodology OPERCOMTM and ICAPS©
5.2 Project Organization
5.3 Pre-commissioning Activities
5.4 “Commissioning” activities
5.5 Start-up Activities
5.6 Engineering Documents
5.7 Commissioning: Onshore and Offshore
6 HEATING AND COOLING SYSTEMS OPERATIONAL TEST PROCEDURES
6.1 General Planning
6.2 Cooling System
6.2.1 Activity completion
6.2.2 Pre-requirement of the OTP for the cooling medium system
6.2.3 Control Philosophy
6.2.4 Post-operational Test
6.3 Heating System
6.3.1 Activity completion
6.3.2 Pre-requirement of the OTP for the heating medium system
6.3.3 Control Philosophy
6.3.4 Post-operational Test
7 CONCLUSION
REFERENCES
APPENDIX 1
APPENDIX 2
APPENDIX 3