Abstract
1 Introduction
1.1 Energy overview in Mozambique
1.2 The Electricidade de Moçambique, E.P.
1.3 Objectives
1.4 Method of attack
1.5 Thesis Structure
2 Plant description
2.1 Unit #1: Bristol Siddeley / GEC
2.2 Current status of the unit
2.3 Unit #2: BBC Type 11-B
2.4 Current status of the unit
2.5 Unit #3: GE Frame 5
2.6 Current status of the unit
3 Plant Performance Analysis with Diesel Oil
3.1 Unit # 2, BBC Type 11-B
3.2 Unit # 3, GE Frame 5
4 Expected Plant Performance Analysis with Natural Gas
4.1 Unit # 2, Sulzer BBC 11-B
4.2 Unit #3, GE Frame 5
5 Expected Plant Performance Analysis with Steam Injection Gas Turbine (STIG)
5.1 Discussions on Steam Injection Gas Turbine Cycle
6 Expected Plant Performance Analysis with Combined Cycle Gas Turbine
6.1 The Combined Cycle Gas Turbine
6.2 Unit # 2, BBC Type 11-B
6.3 Unit #3, GE Frame 5
7 Plant Operability Analysis
7.1 Plant Re-commissioning with current fuel
7.1.1 Re-commissioning of unit #1 with Jet fuel
7.1.2 Re-commissioning of unit #2 with diesel oil
7.1.3 Re-commissioning of unit #3 with diesel oil
7.2 Plant Conversion to Natural Gas
7.2.1 Conversion to natural gas for unit #2
7.2.2 Conversion to natural gas for unit #3
7.3 Plant Re-commissioning with Combined Gas and Steam Cycles
7.3.1 Combined Cycle for unit #2 and unit #3
7.4 Technical and Emissions Analysis
7.5 Financial Assessment
8 Discussions and Recommendations
8.1 Discussions
8.2 Conclusions and Recommendations
Bibliography