Re-Engineering IEC 61131-3 into IEC 61499 Function Blocks 

Get Complete Project Material File(s) Now! » IEC 61499 Execution Semantics The event-triggered semantics of the standard requires the dynamic activation of function blocks on the presence of an event. When a basic function block is activated, the embedded 18...

Forward Kinematics Modelling Using Modified Fuzzy Inference

Get Complete Project Material File(s) Now! » Ankle Complex Human ankle joint is a very complex bony structure in the human skeleton [143] and is fundamentally a combination of two joints (Figure 3.1). The first joint is called the ankle...

Effect of Bubbles on Resistance

Get Complete Project Material File(s) Now! » Individual Anode Signals There have been several studies that have used digital signal processing to analyse the signals from the current through an anode rod (Barber 1992; Walker 1995), the magnetic Chapter 5...

Evaluation based on economic apriori criteria

Get Complete Project Material File(s) Now! » CHAPTER THREE Methodology of Study This study will make use of the simple linear regression equation. The ordinary least square (OLS) method is used which would be employed to establish the power supply...

Using Correction Factors Applied to Airborne Insulation for Predicting Impact Insulation 

Get Complete Project Material File(s) Now! » Chapter 4 Measuring Sound Absorption Area using the Radiation Box Gear Introduction The objective of this chapter is to introduce the other modified equipment method for impact sound measurement resulting in a simplified...

CONSTRUCTION APPROACH, CONSTRUCTION STEPS AND EVALUATION 

Get Complete Project Material File(s) Now! » CHAPTER FOUR CONSTRUCTION APPROACH, CONSTRUCTION STEPS AND EVALUATION CONSTRUCTION APPROACH The approach of a system follows a definite pattern. The pattern followed to construct a system is not restricted to a definite mode...

EIS (ELECTRO CHEMICAL IMPEDANCE SPECTROSCOPY)

Get Complete Project Material File(s) Now! » Electro chemical impedance spectroscopy (EIS) After the capacitance check-up was done for the E8 series samples the one’s with the highest capacitances in this group are picked out and then we preceded with...

Energy Efficiency: The Problem and its Significance 

Get Complete Project Material File(s) Now! » Values and Behaviour To obtain a better understanding of what guides energy efficient behaviour, the Foundation for Research Science and Technology issued a call for research to understand underlying personal values and their...

Internal Milk-run Distribution System

Get Complete Project Material File(s) Now! » JIT JIT has an increased amount of so called supermarket concepts. Supermarkets are areas that serve the nearby assembly line with parts (Faccio et al., 2013). Supermarket could be seen as in-house cross...

Problems and Challenges related to Material Handling Systems

Get Complete Project Material File(s) Now! » Problems related to Buffer Levels Baudin (2004) mentions material handling’s dilemma between delivery performance to production lines and buffer levels on the shop floor, and states that it is challenging to attain an...